Who we are?

SOLARTECH is a supplier of comprehensive solutions in the field of solar farms.

Our activity has been focusing on renewable sources, in particular in solutions in the photovoltaic systems, for over 15 years.  In our cooperation proposal, we take into account the latest technical solutions, using the extensive,several years’s experience in designing and constructing of solar, roof and ground installations. We offer our clients comprehensive investment services, i.e. the design of the optimal solution, which would be  the most beneficial for energy production and for return on equity. We launch the solar plant and obtain all necessary permits. To ensure its optimal operation, we offer operation and maintenance service as well as teletechnical and video monitoring.

The company’s structure is based on the employees of the related Maybatt company, which lead numerous photovoltaic and battery projects for several years. The company had a pilot cell dealing with issues of renewable energy sources, cooperating with scientific institutions and the largest energy suppliers in Poland.

The owner of the company, Bartłomiej Zysiński, a co-founder and a member of the board of the Polish Photovoltaic Society as well as a co-founder of the Polish Chamber of Energy Storage, participant in numerous public appearances, multiple panelist of industry conferences belongs to a small group of specialists and the most recognizable people in the renewable sources industry.

In 2015, along with the growing interest in “green energy” projects in Poland, an independent entity dedicated to investment service was separated from Maybatt. The company appointed specialists experienced in the construction, design and management of various types of solar plants and roof installations. Together with the company’s management they form an efficient team of professionals.

Completed objects

We have built 15 solar farms with a capacity of 0.8 to 1 MW each in the northern part of Mazovia. The investment has been completed by us comprehensively, starting from planning process throughout building and launching the farm along with obtaining all necessary permits. Today we also provide operation and maintenance service for existing farms.

The same investor entrusted us with two further power plants in the vicinity of Lublin with a capacity of up to 1 MW each. The solar farms  were completed within 5 weeks.

We also built another 5 power plants in the pomeranian and warmian-masurian voivodeships, where hilly terrain,impermeable clay soil were  challenging.

Farma o mocy do 1 MW, Gmina Myszyniec, Powiat Ostrołęka
Farma fotowoltaiczna o mocy do 1 MW, Gmina Różan, Powiat Maków Mazowiecki, woj. mazowieckie.
Farma fotowoltaiczna o mocy do 1 MW, Gmina Młynarze, Powiat Maków Mazowiecki, woj. mazowieckie.

We have built the first photovoltaic laboratory in Poland – for PGE Renewable Energy, on the premises of Przedsiębiorstwo Wodociągów i Kanalizacji in Siedlce. The purpose of the investment is to compare the “productivity” of various PV technologies.

The farm  consists of 24 “tables” which will contain various PV modules, and the whole is divided into 8 groups with different technological properties. You can study, among others optimal angle of the panels relative to the sun, compare battery sets, microinverters and optimizers. The purpose of the “lab’ is comparison of various sets of devices and various technologies. The polycrystalline, monocrystalline and thin-film panelsare installed there. Four of the tables react to the sun’s rays. The laboratory has been equipped with following systems: monitoring, data collection, work analysis as well as reporting and work control. The lab’s power will be 100 kW, and the working time about 1000h.

Laboratorium fotowoltaiczne w Siedlcach

We take on challenges, such as construction of a highest located solar farm  in Poland – on Mount Żary, which is based on rocky ground.

We have also built the first PV farm in Poland, which peak power exceeds 1 MW. It is a facility that was built in 2014 in the Zielawa Valley, with a capacity of 1.4 MWp. The investment is an activity of five communes from the lubelskie voivodship that use a photovoltaic farm to ensure local energy security. The farm guarantees additional income for the owners and promotes ecological image of the local government.

We installed solar panels on the roofs of Lidl Polska logistics center buildings in Kałuszyn near Warsaw and in Stargard, in the province of West Pomeranian. These are Lidl’s large warehouses for food and industrial goods -each of them has the size of several football fields. The panels were installed partly on  the roof, on concrete subbranches and directly on the roof membrane. The installation supplies the logistic center with power.

Instalacja PV, Centrum Logistyczne Lidl Polska w m. Kałuszyn
Instalacja PV, Centrum Logistyczne Lidl Polska w m. Kałuszyn

Q22

On the roof of one of the tallest buildings in Warsaw Q22, we have built an innovative system of photovoltaic panels integrated with the facade of the building.

We used translucent panels that not only produce electricity, but also provide shading for the building, which limits heating up in the building. These panels allow you to produce the amount of energy needed to cool the building in summer, while in winter solar farm serves as a heat source, at the same time preventing snow collection on the roof. 308 photovoltaic modules and seven inverters work for the 155-meter high facility, and the maximum installed system power is 76 kW.

Stories of good cooperation

Building a farm is a story of our cooperation with the investor, subcontractors, the local community  and administration.

We launched solar plants in the Ostrołęcki and Makowski poviats of northern Mazovia during winter and spring 2018/2019. Despite cold weather and the wetland meadow area we have completed the investment very efficiently, thanks to the professionalism of all teams building 15 facilities in 9 locations at the same time.

The key to success are people – experienced teams in piling, assembly of structures, panels, cable works, connection of transformer stations. During peak time nearly 150 people worked at our construction sites We support domestic infrastructure by using local hotels, guesthouses, restaurants, gas stations, supermarkets and even hairdressers. On the construction sites you could hear various languages: Polish, Ukrainian, Romanian, Russian, English and German. We have established many relationships using local resources, sharing knowledge, arousing interest in solar energy, all the time showing respect for local communities.

Elektrownia fotowoltaiczna, powiat makowski
Elektrownia fotowoltaiczna, powiat ostrołęcki

Photorelations

Stories from the construction of farms with a capacity of up to 1 MW.